Turn Your Favorite Moments Into Edible Art

Print photos, designs & text on food in seconds. Portable and wireless.

Choose your EdiBot set

Choose color: Green
¥53,000 ¥48,200

  • FDA Compliant

    100% Food-Grade CMYK Edible Ink — Safe & Flavorless

  • Easy Shield

    1-Year Warranty & Free First Print Support Included

  • Fast Shipping

    Free Shipping on Orders $49+

  • Secure checkout
Product Description View details Hide details

EdiBot——全球首款人工智能手持式全彩食品打印机

将你最美好的瞬间变成可食用的艺术品。

使用 EdiBot 让日常食物更具个性化。将其与免费的 HomeSpark 应用程序搭配使用,即可将照片、绘画、信息和 AI 生成的设计转化为全彩可食用作品。

从孩子在饼干上的画作到拿铁上的甜蜜留言,再到生日礼物和个性化礼物,EdiBot 将您的想法变为现实,让每个人都能露出笑容。

  • 把日常零食变成专属惊喜!
    在食物上印上你最喜欢的照片、温馨的便条或有趣的留言。无论是早晨的鼓励“加油!”还是生日的美好祝愿,这些小小的细节都能让熟悉的零食变得格外特别。

  • 专为家庭时光打造!
    将孩子的画作印在饼干上,定制生日甜点,或一起创作节日主题设计。让创作过程成为珍贵回忆的一部分。

  • 让游戏、礼物和聚会更有趣:
    在约会之夜的甜点中加入一些能开启对话的小玩意儿,在派对小吃上印上名字,或者在毕业礼盒里写上个性化的祝福语。让每个人都能发现、享受和分享一些东西。

  • 使用 HomeSpark 打造您的专属设计。
    从照片、图画、空白画布或几个文字开始,利用 AI 探索创意,然后在 HomeSpark 中编辑、保存和重复使用您的设计。无需任何设计经验。

  • 从您的厨房到您最爱的咖啡馆,EdiBot
    让您轻松定制拿铁、饼干、蛋糕和马卡龙,或为您的下次庆祝活动制作可食用装饰品。EdiBot 小巧的无线设计,让您轻松将创意带到家庭聚会、咖啡馆和各种活动中。

小巧的设备,无限的可能。

  • 全彩细节,高达 1200 DPI
    使用全彩 CMYK 食用墨水和高达 1200 DPI 的打印分辨率,将照片、插图和文字带到食物上。

  • 无线蓝牙连接:
    在 HomeSpark 中准备好您的作品,然后将其无线发送到 EdiBot,即可开始您的下一个创作。

  • 每个墨盒最多可打印 3,000 张。
    使用可更换的 EdiBot 墨盒,持续创作。实际打印量因设计尺寸、墨水覆盖率和维护情况而异。

  • 更多个性化选择:
    探索合适的食品表面、糖霜纸、威化纸、翻糖和可食用装饰。精选的吸水材料——包括卡片、礼盒、餐巾纸和丝带——让您在整个活动中保持相同的设计风格。

打印效果会因表面纹理、湿度、涂层和准备工作而异。请使用兼容的 EdiBot 墨盒,并遵循随附的安装、操作和保养说明。

梦想成真。创造梦想。把它印在食物上。

Small Device. Big Possibilities.

APPROX.5s
4× the transfer speed of our previous version.
UP TO1200DPI
2× the resolution of mainstream 600 DPI printers.
CMYK
The lightest handheld full-color printer.
UP TO3,000
Enough prints for a year of everyday family use.
EdiBot CMYK edible Ink Pod, front view.
  • Cyan
  • Magenta
  • Yellow
  • Black

CMYK edible ink

Is the ink safe?

Made with food-grade ingredients and tested by multiple laboratories, our CMYK edible inks are designed for printing directly onto food—so you can create with confidence.

Kosher certified OU Kosher Certification
Our edible inks are certified Kosher by the Orthodox Union (OU).
FDA certified
Independently assessed
An independent safety assessment supports Generally Recognized as Safe (GRAS) status for their intended use in food printing.
Capacity & print yield

Four colors. One pod.

Approx. per color
8 mL
Approx. total ink
32 mL
Estimated prints
3000*

*Approximately 3000 prints per ink pod. Actual yield varies with print size, design coverage, color mix and cleaning cycles.

Ingredients & their roles

Explore the ingredients in our edible inks and the role each one plays.

Ingredients & their roles
IngredientAmount (w/w)Role in the ink
Water67%The liquid base that carries the other ingredients.
Glycerol (glycerin)10%Helps retain moisture and adjust the ink’s consistency.
Propylene glycol20%Helps dissolve ingredients and retain moisture.
Polysorbate 201.2%Helps ingredients mix and supports wetting and spreading.
Potassium sorbate0.1%A preservative that helps limit microbial growth.
Citric acid0.5%Adjusts the acidity of the ink.
ColorantsApprox. 1.2%Provide the color used to create printed designs.
How much ink does a print use?

Approx. 0.011 mLEstimated average per print

Calculated from approximately 32 mL across 3000 prints. This is a capacity-based estimate, not a measured amount deposited on food. Actual use varies with the design and maintenance.

Care for your ink. Use compatible EdiBot Ink Pods and follow the supplied handling and storage instructions.

Create With HomeSpark.

A free app to create, edit, save and share, with or without EdiBot.

Download HomeSpark Free

Supports current and previous EdiBot models and both Ink Pod types.

What Can You Print On?

Made For Family Moments.

Drawing
Breakfast
Birthday
Holiday

What Is Ink Care?

One replacement Ink Pod during 12 months of coverage. Return your current Ink Pod to receive a new one.

How Replacement Works
  1. Contact Ink Care Support

    Enter the dedicated support portal and verify your original order.

  2. Submit Your Request

    Complete the return form with your order and shipping information.

  3. Return Your Ink Pod

    US customers receive a prepaid return label. Customers elsewhere receive instructions from support.

  4. Receive Your Replacement

    After the returned Ink Pod reaches our warehouse and is verified, we ship a new Ink Pod.

Choose Your Set.

Every Set Includes1 EdiBotFree HomeSpark appCore accessoriesFirst Print Support

EdiBot Family Set

EdiBot Food Printer Sets

First Moment Set

¥46,600
1-Year Ink Care
Optional add-on
Large-format Positioning Ruler
Optional add-on

EdiBot Family Set

¥53,000 ¥48,200
1-Year Ink Care
Optional add-on
Large-format Positioning Ruler
Optional add-on

Ready-to-Serve Set

¥72,400 ¥62,700

1 extra Ink Pod

1-Year Ink Care
Optional add-on
Large-format Positioning Ruler
Optional add-on

Frequently Asked Questions.

Is The Ink Made For Food?

Use only the compatible EdiBot edible Ink Pod and follow its labeling and supplied safety guidance.

What Surfaces Work Best?

Results are most consistent on flat, stable surfaces with enough room to move the printer. Use the compatibility section above for examples and limitations.

How Do I Begin A Design?

HomeSpark offers several ways to begin, including a blank canvas, ready artwork, a photographed drawing, or an occasion idea.

What Is HomeSpark?

HomeSpark is the creation workflow used to prepare, personalize, save, and reprint EdiBot designs.

How Should I Care For The Ink Pod?

Follow the approved installation, cleaning and storage guidance supplied with EdiBot.

What Does Ink Care Include?

1-Year Ink Care is included with the first 100 eligible Family and Ready-to-Serve sets as part of a gift pack with a Large-format Positioning Ruler. Both sets share the 100-pack allocation. One pack per eligible set; repeat purchases qualify. Ink Care is otherwise an optional paid add-on. View Ink Care details & terms.

Which Set Should I Choose?

Choose First Moment for a simple start, Family for everyday home creativity, or Ready-to-Serve for a second Ink Pod and small-business readiness.

What About Shipping, Returns And Support?

Every set includes First Print Support. Review the store’s published shipping, duties, returns, and warranty policies before purchase.

Make It Personal.

First Print Support included Secure checkout Pay in 4 with Shop Pay when available
Your selection EdiBot Family Set Color: Green
¥53,000 ¥48,200

Ink Care optional